The bridge was finished in the prefab shop
The bridge was finished in the prefab shop
The bridge was finished in the prefab shop prior to being fitted to the ship, 2nd April 1968.
Reproduced by kind permission of the National Archives of Scotland.
(NAS Ref: UCS 1/118/736/2056. Copyright reserved.)
Previous Photo | Next Photo |
Back - QE2 Photo Gallery 6 |